Home/ Mining Minerals
Iron Ore location for Investment Offer
We hereby representing our Mining Company PT. Multi Kreasi willing to offer a join Operation in their newest Location of Iron Ore which has Information like below this:
A. General Information
- Commodity: Metal Mineral
- Product name: Iron Ore
- Origin: South Kalimantan Indonesia
- Location: Lasung - Tanah Bumbu
- Wide Area:2.250 ha
- Deposit:20 Million Iron Ore
- Ferro Grade:63 - 67 %
- Document: Full Legal Documen from Indonesia Government
- Mine Owner: PT. MULTI KREASI
B. Terms and Condition
- Investment resource: US$ 25 Million from each Investor
- Long term Investment:60 Months [5 years]
- Exploration Plan:200.000MT/Month
- Royalti: US$ 3.00/MT
- Investor Provided:
1. 5 Set of Crushing Machine for Crushed Iron Ore into size 0 - 40mm.
2. Build the Pelletizer Plant for Mine Owner.
C. Budget Cost fro investor :
= [60 monthsx[US$49.00 - US$
35.00]/MTx200.000MT] - US$ 25 Million
= USD 143,800,000 for 60 month (USD 2,369,666 / month)
D. Procedure
1. Investor Issue LOI to Invest
2. Mine Owner issue Investment Summary
3. Investor issue the draft MOU
4. Mine Owner and Investor revised exchanged the draft MOU.
5. Mine Owner and Investor signed Exchanged the MOU.
6. Invited by the Mine Owner into Private presentation.
We hope to hear that from in a near future and please do not hesitite to call us to get all information or send your Irrevocable LOI to invest immediatelly, so that we could send the Investment Summary for you.
A. General Information
- Commodity: Metal Mineral
- Product name: Iron Ore
- Origin: South Kalimantan Indonesia
- Location: Lasung - Tanah Bumbu
- Wide Area:2.250 ha
- Deposit:20 Million Iron Ore
- Ferro Grade:63 - 67 %
- Document: Full Legal Documen from Indonesia Government
- Mine Owner: PT. MULTI KREASI
B. Terms and Condition
- Investment resource: US$ 25 Million from each Investor
- Long term Investment:60 Months [5 years]
- Exploration Plan:200.000MT/Month
- Royalti: US$ 3.00/MT
- Investor Provided:
1. 5 Set of Crushing Machine for Crushed Iron Ore into size 0 - 40mm.
2. Build the Pelletizer Plant for Mine Owner.
C. Budget Cost fro investor :
= [60 monthsx[US$49.00 - US$
35.00]/MTx200.000MT] - US$ 25 Million
= USD 143,800,000 for 60 month (USD 2,369,666 / month)
D. Procedure
1. Investor Issue LOI to Invest
2. Mine Owner issue Investment Summary
3. Investor issue the draft MOU
4. Mine Owner and Investor revised exchanged the draft MOU.
5. Mine Owner and Investor signed Exchanged the MOU.
6. Invited by the Mine Owner into Private presentation.
We hope to hear that from in a near future and please do not hesitite to call us to get all information or send your Irrevocable LOI to invest immediatelly, so that we could send the Investment Summary for you.
| Member Information | |
| Sold by: | Jimmy |
| Phone: | +6281357142811 |
| Your address: | Manyar Rejo IX Surabaya |
| Company name: | Artha |
| Location: | Indonesia |
| Type of offer: | Cooperation |
| No. | Offers from same user | Location | Pic. |
| 1 | Sell Indonesian Zircon Sand 50 % (543 hits) | Indonesia | No |
| 2 | Sell Indonesian Coal - FOB Mother Vessel terms (954 hits) | Indonesia | No |
| 3 | Sell Indonesian Manganese Ore 48% (435 hits) | Indonesia | No |
| No. | Offers from same catergory | Location | Pic. |
| 1 | Sell Indonesian Iron Sand Fe 55% reject on 53% (232 hits) | Indonesia | No |
| 2 | level gauge glass (220 hits) | China | No |
| 3 | Sell coke product (263 hits) | China | No |

